The proposed East Klang Valley Expressway (EKVE) starts from Sg Long at SILK Highway (in the south) and terminates at Ukay Perdana (in the north) .
The EKVE spans approximately 39 km (24km mainline and 15 km spur roads) and is a dual carriageway, two (2) lanes in each direction and expandable to three (3) lanes. A closed toll system and designed to accommodate five (5) toll plazas at each of the planned five interchanges along the entire expressway.
Comments
Post a Comment